Demotek · Built for the NDA

Demolition
Safety Metrics

Enter your numbers once. We'll compute the four rates the NDA Safety Accreditation Program looks at — TRIR, DART, LTIR, and EMR — as 3-year rolling averages.

What These Metrics Mean
TRIR
Total Recordable Incident Rate

Every recordable injury — medical-treatment cases included.

Recordable cases × 200,000 ÷ hours

DART
Days Away, Restricted, Transferred

Cases serious enough to take someone off normal duty — excludes medical-only.

DART cases × 200,000 ÷ hours

LTIR
Lost Time Incident Rate

Cases that resulted in days away from work — most severe subset.

Lost-time cases × 200,000 ÷ hours

EMR
Experience Modification Rate

Workers-comp loss experience vs. industry expected. 1.0 is average.

Issued by your insurer

Your Numbers
2023
2024
2025

Each number can be pulled directly from your OSHA 300A summary.

3-Year Rolling Averages
TRIR
—
0 cases/yr avg
DART
—
0 cases/yr avg
LTIR
—
0 cases/yr avg

Averages across 3 years · 0 hours/yr avg · 0 total hours

TRIR · Awaiting inputs

Fill in cases and hours for at least one year to see your rate.

Scale Explorer

How do injuries scale with company size?

Everything below is shown as a 3-year average per year — the easiest way to compare against the demo industry. The bigger your annual hours, the more cases you can absorb at the same rate. Each line traces a fixed safety rate: pick any annual hours on the bottom axis and the line tells you the matching average cases per year.

Try it: hover the chart at, say, 300,000 hours — you'll see exactly how many cases per year (on average) match each rate.

Showing Total Recordable Incident Rate
↑ Average recordable cases per year
Average hours worked per year across all crews →
Top safety performersTRIR below 1.1

Award-winning contractors. So few injuries that safety becomes a real selling point.

Average demo contractorTRIR around 1.9

Where the typical US demolition company sits, per the Bureau of Labor Statistics.

Your companyAwaiting your numbers

Fill in cases and hours up top and your line will appear here.

DisqualifyingTRIR above 2.3

Above this rate you are disqualified from the NDA Safety Accreditation Program.

Experience Modification Rate (EMR)

EMR is issued by your workers-compensation insurer based on three policy years of loss experience. 1.0 means your losses match what is expected for your class — below is better, above is worse. Enter the value from each year's policy declaration page.

<0.75 · top performer1.125 · demo industry avg1.25+ · disqualifying
3-Year Avg EMR · 1.00 · Below demo industry average

You are sitting just under the demolition industry average of 1.125. Within the NDA accreditation envelope, but closer to the cap than to the top tier.

Settings

OSHA's 200,000 represents 100 employees working 40 hours a week, 50 weeks a year. Change only if you're running a custom internal metric.

Reset everything to defaults

This calculator runs entirely in your browser — nothing is uploaded, stored, or sent to a server. It is a planning tool, not legal or compliance advice. For formal OSHA reporting, use the figures from your 300A summary; for EMR, use the value issued by your insurance carrier. Made by Demotek for the National Demolition Association.

Wire up your first bid

Ready to bidsmarter?

See Demotek in action - a 30-minute walkthrough with our team, tailored to the way your crew bids work. No commitment, no pressure.

Demotek logo

DEMOTEK

Modern takeoff and estimating built for demolition contractors. Bid faster, win more, and run your team off one source of truth.

Operational